Current Status

N.C. State Parks has been diligently working to reopen trails at all accesses of Eno River State Park and at Occoneechee Mountain State Natural Area that sustained damage from Chantal. We have safely reopened 30.7 miles across 26 trails, while the contracted recovery work steadily progresses for the remaining 10.4 miles. As the recreation pillar of our mission states, we are committed to providing and promoting safe, healthy, and enjoyable outdoor recreational opportunities throughout the state.

Map showing the current status of trails and faciltiies at Fews Ford access of Eno River State Park. Click to download in PDF format.
A map of Eno River State Park's Cole Mill Access showing Chantal closures as of Nov. 4, 2026.
Map showing the current status of trails and facilities at Cabelands, Cole Mill, Guess Road, Pleasant Green, and Pump Station accesses of Eno River State Park. Click to download in PDF format.
AccessOpen TrailsClosed Trails
Fews Ford

Buckquarter Creek Trail (1.5 miles)

Connector Trail (0.3 mile)

Eno Trace Trail (0.5 mile)

Fieldstone Trail (0.6 mile)

Knight Trail (0.3 mile)

Piedmont Trail (0.2 mile)

Ridge Trail (1.2 miles)

Shakori Trail (1 mile)

Section of Holden Mill Trail (1.4 miles)

Cox Mountain Trail (4.1 miles)

Fanny's Ford Trail (1 mile)

Section of Holden Mill Trail (1.2 miles)

CabelandsAll trails are open. 
Cole Mill 

Bobbitt Hole Trail (1.6 miles)

Cole Mill Trail (1.2 miles)

Pea Creek Trail (1.3 miles)

Guess RoadAll trails are open. 
Historic Occoneechee SpeedwayAll trails are open. 
Pleasant GreenAll trails are open. 
Pump StationAll trails are open. 
Occoneechee Mountain State Natural AreaAll trails are open. 

 

Background and Completed Work

In July 2025, Tropical Storm Chantal brought heavy rainfall to Alamance, Chatham, and Orange counties. The storm flooded the Eno River, cresting at 25.63 feet, breaking the previous record of 23.58 feet set in 1996 by Hurricane Fran. The Haw River and the Jordan Lake reservoir also saw major flooding. The area sustained around $500 million in damage.

Flooding of Cox Mountain swinging bridge at Eno River State Park in July 2025 due to Tropical Storm Chantal.
The iconic swinging bridge on the Cox Mountain Trail at Eno River State Park during Tropical Storm Chantal in 2025. Photo by K. Radewicz / NC State Parks.

After staff conducted safety assessments, repair and recovery work began at the areas that could be reopened soonest due to less damage: Occoneechee Mountain State Natural Area, which fully reopened on July 21, 2025, and the Historic Occoneechee Speedway access, which fully reopened on Aug. 15, 2025.

The next steps were to clear debris and reopen as many sections of trails as possible. Eno River State Park staff, along with the Infrastructure, Natural Resources, and Trails teams, worked diligently through the fall of 2025, reopening over 28 miles of trail across the park by the end of the year. Work has continued through 2026, and today, nearly 75% of the combined trails system at Eno River State Park and Occoneechee Mountain State Natural Area is open for visitor use.

There are three major damaged areas that needed more extensive work: the suspension bridge on Cox Mountain Trail, the pedestrian bridge on Bobbitt Hole Trail across Piper Creek, and the emergency vehicle ford at Fanny's Ford Trail. These projects require engineering and design, environmental review and permitting, and approvals and coordination with other state agencies.

The suspension bridge on Cox Mountain Trail experienced floodwaters approximately 6.5 feet above the bridge deck. State Construction and State Parks had concerns about the structural integrity of the bridge and its ability to withstand future flood events.

The pedestrian bridge on Bobbitt Hole Trail across Piper Creek did not have a conventional foundation and was thus displaced during the flooding. The replacement will incorporate appropriate foundation considerations to help prevent a similar occurrence in the future.

Both of these bridge projects have completed design and are out to bid for an external contractor to complete.

The severe erosion of the riverbank because of the flooding has compromised the safety of the emergency vehicle ford along Fanny's Ford Trail. State Parks continues to evaluate the repair options to minimize natural resources impacts to the Eno River. The timeline for moving forward with this project will be contingent upon any necessary environmental review and permitting.

 

Recent Updates and Immediate Next Steps

On Nov. 5, State Parks held a pre-bid meeting at Eno River State Park for contractors interested in the bridge projects. The bid is open until mid-November, and the next step will be the bid award.

After a contractor is selected, the exact details of the contract will be negotiated through the State Construction Office before construction can begin.

 

Frequently Asked Questions

When will the Chantal-impacted trails reopen?

  • Cox Mountain Trail: The full reopening of this trail will be contingent upon the completion of the swinging bridge repair.
  • Fanny's Ford Trail: The full reopening of this trail will be contingent upon the completion of the swinging bridge repair.
  • Holden Mill Trail: The existing section of trail that remains closed is frequently inundated after heavy rain. It is currently being evaluated for long-term sustainability and potential comprehensive reroute.
  • Bobbitt Hole Trail: The full reopening of this trail will be contingent upon the repair of the pedestrian bridge across Piper Creek.
  • Cole Mill Trail: We are working to reopen the trail in the next few weeks, pending placement of safety blockades and signage to prevent access to still unsafe areas.

Why can't volunteers repair the trails and bridges?

We frequently receive inquiries about volunteering to assist with Chantal recovery, and we are very grateful for the community's willingness to help. Volunteers have assisted with small debris pickup earlier this year and with a project this fall to plant river oats, Chasmanthium latifolium, a native grass that supports bank stabilization and reduces erosion impacts from Chantal.

State Parks has a longstanding partnership with the Conservation Corps North Carolina to support trail work in state parks. A program of the Conservation Legacy, CCNC engages North Carolina's young adults in conservation service projects that benefit local communities. Crew members provided extensive Chantal recovery work on the Cole Mill, Cox Mountain, Dunnagan, Eno Quarry, and Laurel Bluffs/Mountain-to-Sea State trails, restoring damaged tread, improving drainage, and rerouting flood-damaged sections. From July 2025 to July 2026, the crews completed improvements that strengthen the trails' long-term resilience.

Park staff are working with the Eno River Association, which serves as the park's friends group, to coordinate volunteer workdays in the first months of 2027, to address the additional trail work that needs to be completed at Cole Mill Access along Bobbitt Hole Trail.

Why haven't bridge repairs started?

Repairs to both bridges have been progressing through the required design work behind the scenes. After the floodwaters receded, park staff secured the structures to prevent unsafe use. Then, assessments began with representatives from the Federal Emergency Management Agency and the N.C. Emergency Management at the Department of Public Safety, as well as structural engineers, to determine whether the projects were repairs or replacements. In either instance, before the actual on-the-ground work begins, the following must be determined as part of the design process:

  • Detailed scope of work
  • Cost estimate
  • Funding source
  • Environmental reviews
  • Permitting

One of the larger challenges has been navigating the additional hydraulic and structural requirements associated with the repair or replacement of a bridge within a regulatory floodway. We were required to conduct additional engineering analyses as the projects moved through the technical review process.

These repairs and replacements are also significant construction projects that use taxpayer money received from the state and from the federal government through FEMA. The challenge with addressing recovery after a disaster is to ensure that any repair or replacement work will withstand future flood events. Public funding must be used responsibly, so significant amount of work is necessary to ensure that the repairs and replacements being funded are sustainable in the long term. In other words, we have to prepare for a catastrophe bigger than the last one – if the repair or replacement work gets damaged again, State Parks may not be eligible to receive public funding for another repair or replacement. The suspension bridge, for instance, is such an iconic part of Eno River, and we want to restore this feature to stand long into the future.

As the agency steward of the state's public lands, State Parks has a responsibility to ensure that these places are conserved in perpetuity. We must look at any work we do with the broader picture of sustainability always in mind, and that mandate becomes ever more challenging as storms progressively get worse and more unpredictable.

Why was a trail closed even before Chantal?

Pea Creek Trail was closed in 2020 due to significant erosion along the river and at the Cole Mill Road bridge. The N.C. Department of Transportation completed initial stabilization work in 2022, but a permanent solution required rerouting a section of the trail away from the river and coordinating drainage improvements with NCDOT. At the same time, State Parks, like many government agencies, was undergoing a period of reorganization and transition post-COVID, and there were difficulties filling vacancies in key roles necessary to advance the project forward. Hurricane Helene hit western North Carolina in late 2024, further drawing the limited capacity and resources in support teams away from this specific trail project. Chantal washed away the remaining trail tread beneath the bridge, and repairs now require a larger reroute and coordination with other state agencies to address the damaged crossing.

ENRI Chantal Damage